• NMR CBEC
  • OSU CBEC
  • CBEC Lab

NOTICE: Power Outage for the BRT

MS&P Lab Only - Services and turn around time impacted
Date(s):

A planned power outage is schedule for 5/31 @ 6PM and second on 6/1 @ 8AM for the Biomedical Research Tower (BRT) where the MS&P facility is located. During these two outages the main power will be off for an extended period of time. In preparation for this all instruments need to be turned off before hand. This will cause a delay in turn around for services provided by the MS&P facility.

The MS&P facility is expected to be operational again on the following Monday 6/3.

NOTE: This power outage will not impact the NMR facility.